Scan-to-BIM Cost Estimator

Connecting LOD, disciplines and size to a price range

Choose building type, size, LOD, and disciplines to see a typical Revit modeling price range.

LOD Sets the Modeling Effort

Where each LOD step meets modeling time

Each step from LOD 200 to LOD 350 adds geometry, information, and QA time. Pick what the project will actually use.

Architectural Only or Full MEP

Spanning one discipline to a federated three

Adding structural and MEP disciplines multiplies the elements to model and coordinate from the same cloud.

Scan-to-BIM or 2D As-Builts?

Linking the deliverable to how it will be used

If the drawings will only be printed, 2D CAD may be the better buy. Compare before you price.

Estimate Now, Exact Quote Later

Crossing from ballpark to confirmed scope

Send a floor plan or scope and we confirm LOD, disciplines, and price.

Scan-to-BIM Cost Calculator

Last updated:

Scan-to-BIM Cost Estimator

Four-part graphic showing what drives Scan-to-BIM cost: building type, approximate size, Level of Development, and disciplines modeled.

Ballpark pricing for Revit / BIM models built from laser scans in Pittsburgh & Western PA

Estimated project range
$—
  • Field capture—
  • Model turnaround—
  • DeliverableRevit BIM model

Get an exact quote →

Estimate only — not a quote. Scan-to-BIM pricing depends on LOD, disciplines, building complexity, and required deliverables. Send a floor plan or scope and we'll price it precisely.
CAD Construct LLC · 3D Laser Scanning & Scan-to-BIM · cadconstructllc.com

Statistics graphic: five space types, LOD 200 to 350, three discipline scopes, and two to six weeks modeling turnaround.
Comparison graphic contrasting architectural-only Revit modeling with a full architectural, structural and MEP coordinated scope.
Graphic listing what is included: on-site laser scanning, registration and accuracy check, native Revit modeling, QA and clash review, and exports built to your standards.
Workflow diagram showing how the estimate works: your inputs, base rate, LOD and disciplines adjustment, and exact quote.